Clegg Associates Logo
  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us
Clegg Associates Logo

T: 0117 4567899

T: 01225 541088

  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us

Warminster Civic Centre | Warminster, Wiltshire

Warminster civic centre

In brief

Project Overview

Project details:

  • Client: Warminster Civic Centre
  • Location: Warminster, Wiltshire
  • Team: BTA Architects | Ken-Biggs Contractors Ltd

Project details:

  • Leisure & Hospitality

Share this project:

Project

Warminster Council wanted to modernise the existing Assembly Rooms, a forty-year-old building to accommodate new offices, disabled access and multi-use function rooms. The proposed scheme also involved updates to the kitchen and bar servery. We delivered civil and structural advice alongside the Architect and M&E Services Consultant whilst being guided by the Town Clerk and Councillors.

Action

The fabric of the building was generally sound and provided the canvas for the reforming, modernising and achieving the aims of making a Community Hub accessible by all.  Some time was spent in deciding the future uses of the building and the created spaces to maximise the functions that the structure could provide whilst maintaining a tight grip on the available budget.

Challenges

The former stage and hall were to be split into three spaces with folding sliding doors between that would provide various combinations of room spaces for hire. The main hall had a high ceiling and the use of top hung, suspended folding doors required the design, fabrication and erection in-situ of a 12-metre span steel lattice girder at the mid-point of the hall. Wall stanchions were not required as the wall construction was robust enough to carry the bearing loads. Alterations to other load bearing structures necessitated the introduction of beams and lintels to form new openings.

Result

The local community has embraced the changes to the Assembly Rooms and many local firms hold events there. Council employees’ hot desk from the revamped offices, disabled facilities are now available, and we held our 25-year Anniversary social evening in the main hall. Showcasing our project to staff, friends and Clients.

Prev

Housing Development | Swindon

Next

Waste Treatment Plant | Westbury

Sectors

  • Residential
  • Retail
  • Commercial
  • Heritage
  • Industrial
    • Green Energy
  • Education
  • Healthcare
  • Leisure & Hospitality
  • Off-site construction

Information

  • Services
  • Sectors
  • Projects
  • About
  • Careers
  • News
  • Contact us
  • Privacy Policy
  • Quality Policy

Find us

  • enquiries@cleggassociates.co.uk
  • Bristol:
    • 0117 4567899
    • Runway East Bristol Bridge
      1 Victoria Street, Redcliffe
      Bristol BS1 6AA
  • Trowbridge:
    • 01225 541088
    • Grangeside Workspace, Cedar Tree Close
      Hilperton, Trowbridge, Wiltshire
      BA14 7SZ

Sign up to our newsletter

Follow us

Website by blue bee / © Clegg Associates 2025

Clegg Associates logo