Clegg Associates Logo
  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us
Clegg Associates Logo

T: 0117 4567899

T: 01225 541088

  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us

Off-site construction

Confident wood worker expert. Young man working at factory.

Efficiency in Every Detail

Off-site Construction

Off-site construction offers numerous benefits, and at Clegg, we work closely with our clients to fully leverage these advantages. Unlike traditional on-site construction, off-site production occurs in a controlled environment, improving safety by keeping work at ground level. It also allows for greater control over material quality and workmanship. The reuse of moulds and castings reduces costs while promoting sustainability throughout the construction process.

This approach not only reduces time and storage requirements but also accelerates the overall construction timeline, streamlining the process and minimising certain on-site activities and support. As a result, projects can be completed and occupied more quickly.

At Clegg, we specialise in the planning, design, fabrication, and assembly of building elements. Our off-site construction methods provide several benefits over traditional techniques, including enhanced material quality, reduced on-site risks, and quicker project completion times.

We are committed to delivering practical, cost-effective, and elegant solutions, with a strong focus on sustainability. Our designs are optimised to reduce both embodied and operational carbon, ensuring future-proof outcomes. Using advanced analytical tools and 3D modelling software, we refine foundations, frames, and façades, enhancing safety, material quality, and overall project efficiency.

Get in touch with our team

 

Our Projects

UCL Institute of Neurology, London UK

Heathrow Terminal 5 Multi-storey Car Park, London, UK

Drone shot of Heckfield Place having the foundation pipes laid.

Heckfield Place, Hampshire, UK

Sectors

  • Residential
  • Retail
  • Commercial
  • Heritage
  • Industrial
    • Green Energy
  • Education
  • Healthcare
  • Leisure & Hospitality
  • Off-site construction

Information

  • Services
  • Sectors
  • Projects
  • About
  • Careers
  • News
  • Contact us
  • Privacy Policy
  • Quality Policy

Find us

  • enquiries@cleggassociates.co.uk
  • Bristol:
    • 0117 4567899
    • Runway East Bristol Bridge
      1 Victoria Street, Redcliffe
      Bristol BS1 6AA
  • Trowbridge:
    • 01225 541088
    • Grangeside Workspace, Cedar Tree Close
      Hilperton, Trowbridge, Wiltshire
      BA14 7SZ

Sign up to our newsletter

Follow us

Website by blue bee / © Clegg Associates 2025

Clegg Associates logo