Clegg Associates Logo
  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us
Clegg Associates Logo

T: 0117 4567899

T: 01225 541088

  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us

Heathrow Terminal 5 Multi-storey Car Park, London, UK

In brief

Project Overview

Project details:

  • Client: Heathrow Airport Holdings Limited
  • Location: London, UK
  • Team: Malling Products Ltd | Laing O’Rourke Group

Project details:

  • Commercial
  • Green Energy

Share this project:

Project Overview
As part of the Heathrow, Terminal 5 project, we were responsible for the structural design of four ramps located at the rear of the multi-storey car park.

Each ramp has a diameter of 23 meters and reaches a height of 17 meters, wrapping around large vent shafts connected to the underground station.

Clegg Contribution
In collaboration with Malling Products Ltd, a division of the Laing O’Rourke Group, we reviewed the preliminary design with the project team, which featured tall precast concrete shaft panels. Recognising the challenges of craning these panels into position, we proposed a more efficient solution: casting a ring of wall panels for each storey height. This approach facilitated handling, with each ring comprising four segments weighing approximately 10 tonnes each.

Working closely with Practech Design Studio Ltd and the Contractor’s design managers, we developed a method to securely tie the segments together. We then executed the installation of architectural columns, parapets, and ramp deck panels in a carefully coordinated sequence around the shaft for each of the five storeys.

The thorough discussions and meticulous planning that went into the Terminal 5 project proved effective, as all four ramps were successfully erected safely and within a demanding schedule.

  • OLYMPUS DIGITAL CAMERA

Prev

Pew Mead House

Next

Hungerford Community Tri-Service Station, Berkshire, UK

Sectors

  • Residential
  • Retail
  • Commercial
  • Heritage
  • Industrial
    • Green Energy
  • Education
  • Healthcare
  • Leisure & Hospitality
  • Off-site construction

Information

  • Services
  • Sectors
  • Projects
  • About
  • Careers
  • News
  • Contact us
  • Privacy Policy
  • Quality Policy

Find us

  • enquiries@cleggassociates.co.uk
  • Bristol:
    • 0117 4567899
    • Runway East Bristol Bridge
      1 Victoria Street, Redcliffe
      Bristol BS1 6AA
  • Trowbridge:
    • 01225 541088
    • Grangeside Workspace, Cedar Tree Close
      Hilperton, Trowbridge, Wiltshire
      BA14 7SZ

Sign up to our newsletter

Follow us

Website by blue bee / © Clegg Associates 2025

Clegg Associates logo