Clegg Associates Logo
  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us
Clegg Associates Logo

T: 0117 4567899

T: 01225 541088

  • Services
  • Sectors
    • Commercial
    • Retail
    • Education
    • Healthcare
    • Off-site construction
    • Leisure & Hospitality
    • Heritage
    • Residential
    • Green Energy
  • Our Projects
  • About
    • Sustainability
    • Careers
    • News & Insight
  • Contact us

Pew Mead House

In brief

Project Overview

Project details:

  • Client: Private
  • Location: Wiltshire, UK
  • Team: Baxter Green Architects

Share this project:

Project Overview

Pew Mead House, located in Box, Wiltshire, is a bespoke, split-level residential dwelling designed by Baxter Green Architects. The site posed significant challenges, with ground levels varying by as much as 7m, making the initial piled foundation design too costly. As a result, Clegg was tasked with designing traditional footings alongside multiple retaining walls at various levels to accommodate the site’s topography.

The design also incorporated a significant amount of glazing on several façades, which added complexity to the structural requirements. The superstructure featured load-bearing masonry combined with steelwork to resist both vertical and horizontal loads, ensuring stability. Fixed portals within the masonry panels provided lateral wind load resistance for the glazed areas, while diaphragm action from the ply-faced, sedum roofs facilitated load transfer through the structure and down to the foundations.

Clegg Contribution

Clegg was appointed to design both the substructure and superstructure for Pew Mead House, overcoming significant challenges due to the site’s sloping nature. Clegg’s solution included traditional footings combined with strategically placed retaining walls to manage the varying ground levels.

The superstructure design featured load-bearing masonry integrated with steelwork to support the extensive glazing, ensuring the building’s structural integrity against vertical and horizontal loads. Clegg also ensured lateral stability for the glazed façades by incorporating fixed portals within the masonry. The diaphragm action from the sedum roofs further contributed to the building’s overall load transfer.

Load More

Prev

University of Oxford, Department of Earth Sciences

Next

Heathrow Terminal 5 Multi-storey Car Park, London, UK

Sectors

  • Residential
  • Retail
  • Commercial
  • Heritage
  • Industrial
    • Green Energy
  • Education
  • Healthcare
  • Leisure & Hospitality
  • Off-site construction

Information

  • Services
  • Sectors
  • Projects
  • About
  • Careers
  • News
  • Contact us
  • Privacy Policy
  • Quality Policy

Find us

  • enquiries@cleggassociates.co.uk
  • Bristol:
    • 0117 4567899
    • Runway East Bristol Bridge
      1 Victoria Street, Redcliffe
      Bristol BS1 6AA
  • Trowbridge:
    • 01225 541088
    • Grangeside Workspace, Cedar Tree Close
      Hilperton, Trowbridge, Wiltshire
      BA14 7SZ

Sign up to our newsletter

Follow us

Website by blue bee / © Clegg Associates 2025

Clegg Associates logo