Clegg recently worked on a Sport Pavilion for Falmouth School as Structural and Civil Engineers.
This new sports pavilion is a two-storey braced steel frame building. It comprises an in situ suspended reinforced concrete ground floor slab, a composite metal deck at first floor level, and a metal deck at roof level. There is also an external viewing gallery, with continuous circular steel posts supporting the over-hanging roof over.
The Design
This was a design and build project under the SCAPE framework. Additionally, we worked with Kier Construction as the main contractor.
As a result of ongoing discussions, the design changed numerous times which led to a final solution. Ultimately, the client was happy to sign off and proceed.
Under this framework and via a thorough and comprehensive technical design stage, this project delivered to achieve the client’s expectations, identified at the outset.